You have no items in your shopping cart.
Inter-loc Horizontal Cavity Tray - 2 Brick - 300mm Lead Attached
Preformed leaded horizontal cavity tray system for new build and existing walls.
Featuring integral interlocking lapped joints to securely join cavity tray lengths together and create a watertight run which eliminates the requirement of additional tray jointing adhesives (taping etc.) on site.
Uses:
- At the abutment of a flat roof with a cavity wall
- At the abutment of a lean-to or mono pitch roof with a cavity wall
- On external walls – not exceeding 102.5mm in thickness – built from standard brickwork, blockwork or stone
- Clear cavity widths of between 50mm-125mm
The product images displayed are for illustrative purposes only and may not fully represent the actual product.
The recommendations regarding the application and intended use of the products are based on our current knowledge and experience, assuming proper storage, handling, and application under standard conditions. All product specifications, information, and data provided on the website are subject to change. While the information provided is believed to be accurate and reliable, it is offered without any guarantee, warranty, or responsibility of any kind.